The 0-67 meltdown incident: Difference between revisions

From PuppyDog Online Wiki
Jump to navigation Jump to search
Created.
 
Adding readability spaces for Synthetic's edit.
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
The harrowing events of the 0-67 starlight-nuclear-fusion reactor meltdown occurred on June 07, 2017, during an inspection of the Control Rods, when the alarm went off that 0, 1 and 4 failed out of 0-7.
{{DISPLAYTITLE:The 0-67 Meltdown Incident}}


Shutdown failed, so an evacuation notice was put over the automated siren, but by that point 0 and 1 had melted, and shortly thereafter, 4.
{{Lore}}


The facility's main cores and backup cores were on overdrive, and there was no rescuing anyone within 18 miles.  
The 0-67 Meltdown Incident refers to the nuclear meltdown of the 0-67 Starlight Nuclear Fusion Power Plant in Sigil's Central (a city on Planet Puppy), which occurred in the afternoon hours of June 7, 2017.  


They were gone.
The incident occurred during an inspection of the control rods belonging to the power plant's reactors when reactors 0, 1 and 4 began to melt down.
 
The emergency shutdown system had failed in the process, which lead to the destruction of the power plant in a cataclysmic explosion and reducing the plant to a large, radioactive crater.

Latest revision as of 16:48, 24 August 2025


Caution Lore is here - be advised

The 0-67 Meltdown Incident refers to the nuclear meltdown of the 0-67 Starlight Nuclear Fusion Power Plant in Sigil's Central (a city on Planet Puppy), which occurred in the afternoon hours of June 7, 2017.

The incident occurred during an inspection of the control rods belonging to the power plant's reactors when reactors 0, 1 and 4 began to melt down.

The emergency shutdown system had failed in the process, which lead to the destruction of the power plant in a cataclysmic explosion and reducing the plant to a large, radioactive crater.